MUSEUM

Location : Phoenix, AZ
Tonnage : 257 Ton
Year         : 2009

This Museum project was a project that produced a whopping 171 sheets of drawings accurately detailed by CEI engineers and drafters. The complexity of the steel structure caused several changes to be made by the designers. The structural joints on curved wall were especially challenging and required precision in CEI detailing work. Due to the changing nature of the original design, this project had to endure seven (7) months of back-and-forth communication prior to completion. Our client was happy with the strong commitment we've put in for them during the entire project cycle.

       
 
 