UNIVERSITY'S HEALTH CARE FACILITY OFFICE BUILDING

Location : Louisville, KY
Tonnage : 980 Ton
Year         : 2007

This 980 ton project was an "add-on" project to the first detailing project for the University. The steel fabricator company, our client who was contracted for this project was pleased with CEI's quality of work that they offered another detailing project much larger than the previous one. Two high rise buildings connected by a tower acting as the elevator shaft give a distinctive outlook of a modern campus facility.

       
 
 
+ 3d Model
   download PDF
 
+ Erection Drawings
   download PDF
 
 
+ Assembly Drawings
   download PDF
 
+ Single Part Drawings
   download PDF
 
 
+ Report
 
+ see other portfolio
   
 
Privacy Policy & Terms
Jakarta
© 2010 PT Cantara Engineering International. All Rights Reserved.